PROJECTS

Our Portfolio Of Projects Completed

OUR PORTFOLIO OF PROJECTS COMPLETED

ENVIRONMENTAL IMPACT ASSESSMENTS (EIA) FOR INDUSTRIAL PROJECTS

  • EIA Study for Kinabalu Non-Associated Gas Development Project, Offshore Sabah for PETRONAS Carigali Sdn. Bhd.
  • Subject Specialist, Part of the EIA Study team for RAPID Petrochemical Plant in Pengerang, Johor
  • EIA Study for Regional Off-Site Scheduled Waste Storage Facilities in Peninsular Malaysia for PETRONAS Gas Bhd.
  • EIA Study for the Scheduled Waste Landfill for Taiko Group Bleaching Earth Sdn. Bhd.
  • EIA Study for the Scheduled Waste Landfill for Premier Bleaching Earth Sdn. Bhd.
  • EIA Study for Waste Oil, Coolant Recovery and Container Recycling in Johor for Ranama Resources Sdn. Bhd.
  • EIA Study for a Biodiesel Plant in Kuching, Sarawak for Global Bonanza Sdn. Bhd.
  • EIA Study for a Biodiesel Plant in Kuantan, Pahang for Mission Biotechnologies Sdn. Bhd.
  • EIA Study for a Biodiesel Plant in Gebeng, Pahang for Plant Biofuel Corporation Sdn. Bhd.
  • EIA Study for a Biodiesel Plant in Kuantan, Pahang for Advanced Biofuel Tech Sdn. Bhd.
  • EIA Study for a Biodiesel Plant in Carey Island, Selangor for Sime Darby Biodiesel Sdn. Bhd.
  • EIA Study for a Scheduled Waste Recovery Facility for Drums and Containers in Johor for Ranama Resources Sdn. Bhd.
  • EIA Study for a Scheduled Waste Recovery Facility for Rejected Compounded Latex Rubber in Seberang Perai, Penang.
  • EIA Study for a Scheduled Waste Recovery Facility for Discarded Automobile Lead-Acid Batteries in Negeri Sembilan.
  • EIA Study for a Scheduled Waste Recovery Facility in Penang for Reclaimtek Sdn Bhd.
  • EIA Study for an Oleochemical Plant in Selangor for ICM Specialty Chemicals Sdn. Bhd.
  • EIA Study for a Scheduled Waste Recovery Facility for Sungeel Hi-Tech Sdn. Bhd.
  • EIA study for Spent solvent and waste oil recovery plant, Gopeng Perak, Malaysia
  • EIA study for Nickel waste recovery plant, Gopeng Perak, Malaysia
  • EIA study for recycling of used industrial drums and containers in Port Klang, Selangor
  • EIA Study for 200 MTPD PFA Crude Plam Oil (CPO) Pre-Treatment Plant (PTP) and 200 MTPD High Palm Fatty Acid Distillate (PFAD) Esterification Plant (PEP) for Sime Darby Biodiesel Sdn.Bhd. Carey Island, Selangor.
  • EIA study for Nickel waste recovery plant, Gopeng Perak
  • EIA Study for Separation of Copper from Electrical Cable Waste (Dry) & (Wet) Process Recovery, for Foo Xin Industry Sdn Bhd, Klang, Selangor
  • EIA Study for Industrial Grade Plastic Recycling Factory for Green Venture Recycle Sdn Bhd Klang, Selangor
  • EIA Study for Industrial Grade Plastic Recycling Factory for Trico Polymer Industry Sdn Bhd Port Klang
  • EIA Study for Industrial Grade Plastic Recycling Factory for CY Plastic Recycling Sdn Bhd, Bukit Beruntung Selangor
  • EIA Study for Industrial Grade Plastic Recycling Factory for Golden Mile Plastic Sdn Bhd, Klang, Selangor
  • TOR for Separation of Copper from Electrical Cable Waste (Wet) Process for Grand Environment Sdn Bhd., Shah Alam
  • EIA Study for Industrial Grade Plastic Recycling Factory for HKS Century Sdn. Bhd. Port Klang, Selangor
  • EIA Study for the Expansion of the Existing 2,500 MT/month Calcium Carbonate Filler Processing Plant for TG FMT Sdn. Bhd., Setia Alam, Selangor
  • Environmental Impact Assessment (EIA) For Proposed 600 MTPD Crude Palm Oil (CPO) and Dry Fractionation Plant, 150 MTPD Refined Palm Stearin (RPS) Fractionation Plant, 250 MTPD RPL (Olein) Fractionation Plant, 30 MTPD Calcium Soap Plant, 50 MTPD Powder Fat Plant and 360 MTPD Packaging Plant for KKSJ Oil Palm Refinery, Jerantut, Pahang
  • Environmental Impact Assessment (EIA) For the Proposed 150,000 MTPY FFA Pre-Treatment Plant (PTP II) and 150,000 MTYP Biodiesel Transesterification plant (BTP II) for Sime Darby Oils Biodiesel Sdn. Bhd., Carey Island, Selangor Darul Ehsan
  • Environmental Impact Assessment (EIA) For the Proposed Development Of New Base Oil Recovery And Re- Refining Plant, Negeri Sembilan
  • Environmental Impact Assessment (EIA) For the Additional Scheduled Waste Codes (SW 308, SW 310 and SW 311) for the Existing Oil Recovery Plant at Cenviro Recycling & Recovery Sdn. Bhd. on Lot 6638, Mukim Jimah, Daerah Port Dickson, Negeri Sembilan
  • Environmental Impact Assessment (EIA) For the Preparation for Scheduled Waste Recycling facility for SW 104 & SW 422 at Lot 3295,Bernang Industrial Park, Mukim Bernang, Daerah Ulu Langat Selangor
  • EIA Study for Industrial Grade Plastic Recycling Factory for K&C Plastic Sdn. Bhd. Port Klang, Selangor
  • EIA Study for Industrial Grade Plastic PET Recycling Factory for Cenviro Recovery and Recycling Sdn. Bhd. Negeri Sembilan
  • EIA Study for Aluminium smelting facility in Melaka

ENVIRONMENTAL IMPACT ASSESSMENT FOR INFRASTRUCTURE PROJECTS

  • EIA for the Dredging works at the estuary of Sungai Pengkalan Nangka in Kelantan, Malaysia for the Ministry of Agriculture.
  • EIA for the East Coast Highway, Malaysia.
  • EIA for the New Pantai Expressway, Malaysia.
  • EIA for the Seremban 2 New Township, Seremban, Malaysia.
  • EIA for the National Technical University College of Malaysia
  • EIA for the Golok River Drainage and Flood Mitigation Scheme in Kelantan, Malaysia.
  • EIA Study for the Proposed Flood Mitigation Plan of Sungai Muda in Kedah, Malaysia.
  • EIA Study for Sedili Tourism Development Project, Johor, Malaysia involving the development of a coastal tourist resort by the beach front.
  • EIA Study for Tropical Villa Tourism Development Project, Johor, Malaysia involving a coastal tourist resort development by the beach front.
  • EIA Study for Ijok Golf Course Project involving the development of a golf course resort on 200 acres of plantation land in Selangor, Malaysia.
  • EIA Study for Saujana Impian Golf Course Project involving a golf course resort development on a land area of 200 acres in Selangor, Malaysia.
  • Strategic EIA Study for Solar Project in Penang for Industrial Concrete Products Sdn. Bhd.
  • Strategic EIA Study for Solar Project in Tampok, Rengit Johor for Ditrolic Sdn. Bhd.
  • Strategic EIA Study for Solar Project in Kg. Serukam, Sg Petani, Kedah for Ditrolic Sdn. Bhd.
  • EIA for Development of an Island Reclamation Project in Melaka
  • EIA Study for Solid Waste Disposal (Landfill) in Krubong, Melaka, which involves municipal waste disposal on a swampy area using sanitary landfill methods.
  • EIA and Hydraulic Report for the Proposed Rekabentuk Terperinci dan Pembinaan Struktur dan Mendalamkan Muara Sungai Pangkalan Nangka, Tumpat, Kelantan for Bahagian Pengairan dan Saliran Pertanian, Kementerian Perindustrian Asas Tani

ENVIRONMENTAL SITE ASSESSMENT (ESA)/ SOIL & GROUNDWATER STUDIES

  • Preliminary Assessment, Contamination Abatement & Clearance Testing Due Diligence Study, NRC Plating Decontamination Project, NRC Plating Building, Spansion (Kuala Lumpur) Sdn. Bhd., Malaysia.

GUIDELINES AND SPECIALIST STUDIES

  • Preparation of the EIA Guidelines for Agriculture, Forestry and Fishery projects in Malaysia for the Department of Environment Malaysia.
  • Preparation of the Guidance document Environmental Essentials for the Siting of Industries in Malaysia (EESIM) for the Department of Environment Malaysia.
  • Report on the Development of an Environmental Health Risk Matrix and inventory for Malaysia for the Ministry of Health.

ENVIRONMENTAL PLANNING & MODELLING STUDIES

  • Environmental Planning Blueprint for Iskandar Malaysia in association with MINCO
  • Melaka River Rehabilitation Project jointly funded by the Governments of Denmark (DANCED) and Malaysia.
  • Environmental Planning for the Melaka River Rehabilitation Project for (DANCED) and Government of Malaysia.
  • Environmental Planning for the Flood Mitigation and River Rehabilitation Study for the Sungai Petani Catchment in Kedah, Malaysia.
  • Water Quality Modelling for the Scheduled Waste Recovery Facility in Kedah.
  • Water Quality Modelling for the Chemical Facility in Negeri Sembilan.
  • Air Quality Modelling for the Scheduled Waste Recovery Facility in Penang.
  • Air Quality Modelling for the Chemical Facility in Selangor.
  • Noise Modelling for the Scheduled Waste Recovery Facility in Pahang.
  • GIS mapping services for the proposed oil palm plantation in Cameroon (80,506 ha)

ENVIRONMENTAL MANAGEMENT, MONITORING & AUDIT

  • Environmental Management Plan (EMP) for the Proposed IMT-GT Plaza in Bukit Bunga, Jajahan Tanah Merah, Kelantan Darul Naim for the East Coast Economic Region Development Council
  • Environmental Management Plan (EMP) & Erosion and Sediment Control Plan (ESCP) for Projek Penggantian Aset dan Menaiktaraf Bagi Operasi Melebihi Kapasiti Rekabentuk di Loji Rawatan Air Sungai Langat
  • Environmental Management and Monitoring Plan for Proposed Construction of Sales Gas Pipeline from Plentong, Johor Bahru to Singapore Gas Transmission System for PETRONAS Gas Berhad.
  • Environmental Management and Emergency Response Plan for Betty Revisit-4 Project, Proposed New 18” Gas Pipeline from BEP-A To BNG-B, Baram Delta, Sarawak, Malaysia.
  • Post- Environmental Impact Assessment environmental compliance monitoring for Betty Revisit- 4 Project, Proposed New 18” Gas Pipeline from BEP-A To BNG-B, Baram Delta, Sarawak, Malaysia.
  • Post- Environmental Impact Assessment environmental compliance monitoring for Seremban 2 Township Development Project in Negeri Sembilan, Malaysia.
  • Environmental monitoring and audit for the Bangi Golf Resort Project in Selangor, Malaysia.
  • Environmental management and monitoring plan for the National Technical University College Project in Melaka, Malaysia.
  • Environmental management and monitoring plan for the rejected compounded-latex rubber recovery project in Penang, Malaysia.
  • Environmental management and monitoring plan for Ranama Resource Drum and Container Recycling Plant in Johor, Malaysia.
  • Environmental management and monitoring plan for the Biodiesel Plant in Kuantan, Malaysia.
  • Environmental Management Plan (EMP) for the proposed IMT-GT Plaza in Bukit Bunga, Jajahan Tanah Merah, Kelantan Darul Naim for the East Coast Economic Region Development Council (ECERDC)
  • Environmental Impact Statement for Proposed Fibre Processing and Biomass Treatment Plant at Lot 7570 & 7571, Mukim Pogoh, Segamat, Johor Darul Takzim.
  • Environmental Impact Statement for Leader Universal Aluminium Sdn Bhd- Nilai Plant
  • Environmental Audit for Harbour Home Sdn. Bhd. Proposed Industrial Park Development On PT 43453 And PT 43454 (Previously Lot 12234) Mukim Tanjung Dua Belas, Kuala Langat, Selangor Darul Ehsan. (Phases 2A & 2B)
  • Environmental Audit for Harbour Home Sdn. Bhd. Proposed Industrial Park Development On PT 43453 And PT 43454 (Previously Lot 12234) Mukim Tanjung Dua Belas, Kuala Langat, Selangor Darul Ehsan. (Phases 1)
  • Environmental Audit for STC Property Management Services Sdn. Bhd. for The Proposed Mixed Development On Partial Lots of 189, 190, 2499 And Entire Lots of 195, 2502 And 2570 In Section 4, Seberang Perai Utara, Pulau Pinang

MUNICIPAL SOLID WASTE MANAGEMENT

  • Survey on SW Composition, Characteristics & Existing Practice of SW Recycling in Malaysia, for the Solid Waste Department, Ministry of Housing and Local Government
  • Environmental Due Diligence Audit Report, Kayu Madang Sanitary Landfill, Telipok, District Of Kota Kinabalu, State Of Sabah, Malaysia prepared on Behalf of MS Smart (M) Sdn Bhd for The World Bank, Washington D.C.
  • EIA study for Kota Kinabalu Sorting and Composting Plant, Telipok, State of Sabah prepared on Behalf of MS Smart (M) Sdn Bhd for The World Bank, Washington D.C.
  • Technical methods of landfilling to reduce leachate, odour, fumes and fire problems in landfills.
  • Supervise the design, erection, testing and commissioning of the Labuan Incineration Plant Labuan, Malaysia.
  • Municipal Solid Waste Characterisation Study at the Karadiyana Dumpsite, Colombo, Sri Lanka for Malakoff Corporation Berhad
  • Feasibility Study for the Proposed Material Recovery Facility (MRF) at Jeram Sanitary for Landfill Worldwide Landfills Sdn. Bhd.
  • Compendium of key statistics of the waste received at the Jeram Sanitary Landfill and scenario modelling for an Integrated Solid Waste Management Centre
  • Waste Characterisation Study of the incoming waste at the Jeram Landfill, Worldwide Holdings
  • Part of the team that prepared Shah Alam Solid Waste MasterPlan 2019-2034 for MBSA
  • EIA study for Integrated Waste Management Plant Project for Borneo Waste Industries Sdn. Bhd., Telipok, Sabah
  • Solid Waste Composition, Characterisation, Calorific Value Study for Ranhill Capital Sdn Bhd at Bukit Payong
  • Engineering Works for Solid Waste Management for the proposed KXP Airport City at the Kulim International Airport, Kedah.
  • Solid Waste Composition, Characterisation, Calorific Value Study for Ranhill Capital Sdn Bhd at Sungai Udang
  • Pre-feasibility study for the solid waste management in the state of Kedah.
  • Solid Waste and Public Cleansing Master Plan for the State Government of Selangor.

SCHEDULED & HAZARDOUS WASTE MANAGEMENT

  • Monitoring and Audit for the Proposed expansion of Kamunting Incineration Plant for Edgenta Mediserve Sdn. Bhd.
  • Decontamination Abatement & Clearance Testing Due Diligence Study, NRC Plating Decontamination Project, NRC Plating Building, Spansion (Kuala Lumpur) Sdn. Bhd., Malaysia.
  • Report for the Government Authorities On Environmentally Sound Disposal Of De-oiled Spent Bleaching Earth.
  • Special Waste Management Study for the Jimah Energy Ventures Sdn Bhd.
  • Special Waste Management Study for Tanjung Bin Power Plant for Fly Ash
  • Special Waste Management Study for Tanjung Bin Power Plant for Bottom Ash
  • Consultancy Services to handle the bottom ash for Holcim Marketing (Malaysia) Sdn. Bhd.

Business to Business Matching Programe

  • Organised face-to-face meetings for a Business Partner Mediation in Malaysia in 2016 for Rubber, Plastic and Environmental-related companies in Malaysia and Germany as potential local business partners. Project funded by German Ministry for Economic Affairs and Energy (BMWi).
  • Organised face-to-face meetings for a Business Partner Mediation in Malaysia in 2013 for Waste and water related companies in Malaysia and Germany as potential local business partners. Project funded by German Ministry for Economic Affairs and Energy (BMWi).

LIST OF TECHNOLOGY REPRESENTATION AND ASSOCIATES

Gunther Envirotech GmbH

Günther Envirotech GmbH is part of Anlagenbau Günther GmbH and has been operating for more than 90 years. As a leader in waste separation technology, Günther Envirotech has developed customised solutions: from the mobile individual machines to stationary treatment plant. The customer profile includes private waste management companies, municipalities, waste companies, energy generator or thermal power station operators. Günther Envirotech GmbH also manufactures star screens and the steel disc screens for Komptech GmbH’s composting equipment.

trAIDe GmbH – Project Management

Based in Cologne, Germany, trAIDe GmbH has been successfully bringing together business and trading communities to a common international platform. trAIDe GmbH helps with strategic and operative challenges within the internationalization process trAIDe GmbH was selected as project leader by the German Ministry of Economy and Technology (BMWi)

New Energy Corporation Pty Ltd

New Energy is a privately-owned Australian company. New Energy’s mission is to integrate generic waste management and recycling technologies with an advanced thermal conversion technology (gasification) to create a zero-landfill waste treatment solution. New Energy is the exclusive Global licensee (ex-Americas) for the Entech WtGas-ResTM gasification technology. Entech Renewable Energy Solutions (Entech) is a privately-owned Australian company which has been designing, supplying and installing (operating) gasification plants worldwide since 1990. New Energy has cross-ownership with Entech, ensuring that the international waste to energy expertise gained is fully applied to New Energy’s projects.

The low temperature gasification process is a commercially proven, internationally approved solution utilising patented technology, ensuring financial and technological “de-risking” of projects. With over 5,000,000 operating hours achieved by Entech plants worldwide, the operations of the plant are guaranteed by energy warranty insurance policy.

Master Plan

  • Selangor State Solid Waste and Public Cleansing Master Plan (PISPPANS)
  • MBSA Solid Waste Master Plan
Copyrights © 2024 All Rights Reserved by GSR ENVIRONMENTAL CONSULTANCY SDN. BHD.